Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /mnt/greatindia/wp-content/plugins/revslider/includes/operations.class.php on line 2254

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /mnt/greatindia/wp-content/plugins/revslider/includes/operations.class.php on line 2258

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /mnt/greatindia/wp-content/plugins/revslider/includes/output.class.php on line 2941

Deprecated: Function create_function() is deprecated in /mnt/greatindia/wp-content/plugins/revslider/includes/framework/functions-wordpress.class.php on line 257
Blasting, Metalizing and Painting – GISF Engineering Private Limiteds

Blasting, Metalizing and Painting

Blasting

  • GISF is capable of achieving ISO 8501-1 SA standards of up to SA 2.5
  • 1000 square meters of blasting is done per day

Painting

  • At GISF we are comfortable at meeting customers requirement for painting
  • 1000 square meters of painting is done per day using air less painting guns
  • Multiple layer of coating is done based on the data sheet provided with the paint and customers specs
Scroll to top